NO: Get in touch with your inspector to confirm the correction has actually been built. The inspector will update the department records.You will need to post a Boiler Set up Report (BIR) (Sort BLR213N – Aspect I) to TDLR for every boiler in 30 days of installation. Do not send payment With all the kind. A $25 Bill will be created in the event th